Saturday, April 2, 2011

Home Reno Blog - Wiring

Lets go inside and see the wiring project currently taking place...




Preparation for down lights, fan wiring and plaster ceiling for main living area.





Down lights and fan wiring for dining area





Down lights and fan for lanai area.





Kitchen area. Adding extra power points. No idea on the kitchen cabinet yet.



Room no 3 upstairs, add air con, fan and down lights points.




Room no 2 upstairs, add air con, fan and down lights points.



Add water heater, water pump and extra distribution box on the second level family area for future upgrade (as if!)



Can you see the fan hook all the way up there? Need at least a 6 foot fan pole to install the fan in the second level family area.




Add extra power point and antenna point for mini home theater in the master bedroom.



Air con point for master bedroom.



Add extra power points, for future walk-in closet.



Master bedroom toilet.

Ok, that's all for today. I'll update more stuff tomorrow... stay tune! :)